Meredith Drive Preservation
Sector: Power Transmission • Location: Urbandale, Iowa, United States of America
Source: Dodge USA
Approximately 12,000 SY of Full-Depth Patching Approximately 800 SY of Partial-Depth Patching Approximately 6,500 TON of HMA Overlay Approximately 1,500 SY of 10-Foot PCC Trail. Related items including railroad coordination, removals, restoration, traffic control, erosion control, and survey.MEREDITH DRIVE PRESERVATION - WEST OF 104TH STREET: PCC AND HMA PATCHING AT VARIOUS LOCATIONS ALONG MEREDIT
- Status
- Closed
- Sector
- Power Transmission, Rail, Road, Power Generation (CCGT), Government, Commercial
- Location
- Urbandale, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Meredith Drive Preservation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Approximately 12,000 SY of Full-Depth Patching Approximately 800 SY of Partial-Depth Patching Approximately 6,500 TON of HMA Overlay Approximately 1,500 SY of 10-Foot PCC Trail. Related items including railroad coordination, removals, restoration, traffic control, erosion control, and survey.MEREDITH DRIVE PRESERVATION - WEST OF 104TH STREET: PCC AND HMA PATCHING AT VARIOUS LOCATIONS ALONG MEREDITH DRIVE BETWEEN 121ST STREET AND 104TH STREET; PCC PATCHING ALONG 121ST STREET BETWEEN DOUGLAS AV... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Urbandale |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Rail, Road, Power Generation (CCGT), Government, Commercial |
Article published date | 2024-04-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
