logo

Merida III - 400 MW gas fired

Sector: Residential • Location: Mexico

Source: International Finance Corporation (IFC)

Project
Completed

Summary Of Project Information (SPI)Project NameMexico-Merida III     RegionLatin America and CaribbeanSectorProject No008237Projected Board DateJune 23, 1997Company NameAES Merida III, s. de R. L. de C. V. (AES Merida III)Technical Partner and/or Major Shareholders The AES Corporation (55%), Nichimen Corporation (25%) and Grupo Hermes S. A. de C.V. (20%) are the shareholders and will be the sole

Project Information FAQ

Project Information

4 Q
The project “Merida III - 400 MW gas fired” is an infrastructure initiative in the Residential sector, located in Mexico. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Summary Of Project Information (SPI)Project NameMexico-Merida III     RegionLatin America and CaribbeanSectorProject No008237Projected Board DateJune 23, 1997Company NameAES Merida III, s. de R. L. de C. V. (AES Merida III)Technical Partner and/or Major Shareholders The AES Corporation (55%), Nichimen Corporation (25%) and Grupo Hermes S. A. de C.V. (20%) are the shareholders and will be the sole owners of Merida III. Project Cost Including proposed IFC investment The project cost is estimated at US$230 million. It is contemplated that IFC invest up to US$21 million in an “A” Loan and up to US$82.5 million in a “B” Loan. IFC may commit up to $27 million through a liquidity back-stop facility to enable extending the “B” Loan maturities.Location of project and Description of site The Project will be located near the city of Merida, in the Yucatan Province of Mexico. The Project consists of two Westinghouse Electric Corporation (‘Westinghouse’) 501F turbines with dual fuel (gas and distillate) capability. Both units of the project are expected to be completed by February, 2000.Description of Company and Purpose of Project The Project is to build, own and operate (‘BOO’) a greenfield, 484 MW gas turbine combined cycle generation facility. The Project consists of two Westinghouse Electric Corporation 501F turbines with dual fuel (gas and distillate) capability. The Project will be constructed by Westinghouse under a turnkey contract. The Project will sell power to Comisión Federal de Electricidad (‘CFE’), the Mexican electric utility, under a 25-year take-or-pay Power Purchase Agreement. AES Merida III will be the first non-captive private investment since the nationalization of the Mexican Power sector in 1960. Through this private initiative, which conform to the policies being espoused by IBRD, it is expected that IFC and IBRD will have a larger influence on the privatization and regulatory reform measures for the power sector, which are currently underway. Further, the AES Merida III project ideally suits IFC’s emphasis of developing demonstration projects in countries at the threshold of opening up power sector such as Mexico.     Environmental Category and Issues This is a category A project under IFC''s environmental review procedure. Environmental issues associated with this project include air emissions, noise, land use, water supply, liquid effluents, fuel transportation, socio-economic impacts and worker safety. The Environmental Assessment was prepared by an independent environmental consulting firm for Comision Federal de Electricidad (CFE) on behalf of the successful bidder in 1994. The sponsor prepared an Executive Summary of the EA which updates the project characteristics and analyzes the project with respect to World Bank policies and environmental guidelines. These were released to the World Bank Public Information Center in April 1997. The sponsor is also consulting and disclosing the EA in country. The use of natural gas as primary fuel will result in inherently low SOx and particulate emissions. NOx emissions are reduced by dry low NOx combustors. The flue gas will be emitted by a 76 meter stack. The project site is in an existing industrial park and the closest residential area is over 1 km away from the site boundary. The related facilities such as transmission lines and natural gas pipeline to supply fuel to the project are responsibilities of CFE. IFC''s due diligence will include environmental aspects of these related facilities.The Environmental Assessment is from the Public Information Center.Host country location of environmental documentsAES Merida III Paseo de Montejo Merida, MexicoDate SPI sent to PIC      May 20, 1997For Additional Information contact: Corporate Relations Unit -telephone: (202) 473-7711facsimile: (202) 974-4384Environmental documents for this project are available at http://www.ifc.org and from the World Bank InfoShop (http://www.worldbank.org/html/pic/aboutinfo.html).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data