Meridia Hackensack 151 - Mixed-Use Development with Parking
Construction documents · New Jersey · Last reported Dec 2024
Source: Dodge USA
Construction of a six-story mixed-use development consisting of 170 one-bedroom units and 40 two-bedroom units, a fitness center, 222 parking spaces, more than 6,000 square feet of restaurant and retail space, a coffee shop, an outdoor dining area, a dog park and a bocce court. Total square feet is estimated
- Status
- Closed
- Sector
- Consumer Products, Residential, Manufacturing (Industrial), Car parking, Commercial, Automotive
- Location
- Hackensack, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Meridia Hackensack 151 - Mixed-Use Development with Parking
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of a six-story mixed-use development consisting of 170 one-bedroom units and 40 two-bedroom units, a fitness center, 222 parking spaces, more than 6,000 square feet of restaurant and retail space, a coffee shop, an outdoor dining area, a dog park and a bocce court. Total square feet is estimated |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | Hackensack |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Residential, Manufacturing (Industrial), Car parking, Commercial, Automotive |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- WMATA Orange and Blue Line Rehabilitation
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
