logo
ProjectEnded

MeRIT - Maximising Renewable Energy Integration

The status, timeline and source of this project. A free account opens every field.

Source: EU Funding & Tenders Portal

Esave has designed a Hybrid Energy Storage Solution which uniquely integrates flywheel kinetic energy storage, battery energy storage and power electronics technologies. MeRIT is ultra-fast responding, provides greater reliability, longer lifecycles, is environmentally sustainable, safer and offers overall best total cost of use (TOC) than any other solution. The overall objective of the MeRIT pro

Status
Closed
Sector
Solar, Energy Storage, Power Generation (CCGT), Manufacturing (Industrial), Wind, Education
Location
Ireland
Updated
22 Jul 2026
Source
EU Funding & Tenders Portal

ConstructChat

Ask ConstructChat about MeRIT - Maximising Renewable Energy Integration

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “MeRIT - Maximising Renewable Energy Integration” is an infrastructure initiative in the Solar sector, located in Ireland. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Participants

Not available for this record.

Status

Original status

ended

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Esave has designed a Hybrid Energy Storage Solution which uniquely integrates flywheel kinetic energy storage, battery energy storage and power electronics technologies. MeRIT is ultra-fast responding, provides greater reliability, longer lifecycles, is environmentally sustainable, safer and offers overall best total cost of use (TOC) than any other solution. The overall objective of the MeRIT project is the commercialization of a new Hybrid Energy Storage System that ‘maximizes renewable energy integration’ through provision of fast-responding ancillary services, dramatically reduces the 60% - 70% capacity losses of wind and solar generation due to intermittency and no storage; it also reduces curtailment losses through synthetic inertia. MeRIT users will benefit from new ancillary services revenues, additional capacity revenues, reduction in curtailment losses and compliance with new grid code modifications. The Esave management team is highly entrepreneurial and has extensive experience and skills in design and manufacture of power electronics, development of computer systems, software, provision of electrical power quality services and consultancy. The objective of the Feasibility Study is to (1) Develop cost and payback financial models for the integration of MeRIT with wind and solar installations internationally. (2) Complete the planning process for the installation of a Demonstration System which will be installed on a windfarm in Ireland, controlled, monitored and validated by EirGrid, Ireland’s Transmission System Operator. MeRIT is at the stage of TRL5 and an operational prototype system is ready for installation. Esave is partnering with Mainstream Renewable Power, a major wind and solar developer/operator, who will facilitate the installation on a windfarm that they operate. The Energy Research Centre, University College Dublin - Energy Institute, is also partnering and assist in renewable integration expertise and system modelling.

Location

Country

Ireland

Source

Source

EU Funding & Tenders Portal

URL

More Details

Record type

Project

Sector

Solar, Energy Storage, Power Generation (CCGT), Manufacturing (Industrial), Wind, Education

Article published date

2026-01-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project