logo

Mero-4 Development Phase

Sector: Oil and Gas • Location: Rio de Janeiro, Brazil

Source: WebWire

Project
Completed

The fourth development phase of the Mero field on the Libra block, located 180 kilometers off the coast of Rio de Janeiro, Brazil, in the pre-salt area of the Santos Basin. This phase connects 12 wells to the new Alexandre de Gusmão FPSO unit with a production capacity of 180,000 barrels of oil per day, designed to minimize greenhouse gas emissions.

Status
Closed
Sector
Oil and Gas
Location
Rio de Janeiro, Brazil
Updated
22 Jul 2026
Source
WebWire

ConstructChat

Ask ConstructChat about Mero-4 Development Phase

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Mero-4 Development Phase” is an infrastructure initiative in the Oil and Gas sector, located in Rio de Janeiro, Rio de Janeiro, Brazil. Taiyo aggregates data on it from WebWire.

Participants

Not available for this record.

Status

Original status

Completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The fourth development phase of the Mero field on the Libra block, located 180 kilometers off the coast of Rio de Janeiro, Brazil, in the pre-salt area of the Santos Basin. This phase connects 12 wells to the new Alexandre de Gusmão FPSO unit with a production capacity of 180,000 barrels of oil per day, designed to minimize greenhouse gas emissions.

Original sector

Energy

Location

Country

Brazil

State

Rio de Janeiro

City

Rio de Janeiro

Source

Source

WebWire

URL

More Details

Record type

Project

Sector

Oil and Gas

Article published date

2025-05-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project