Merrill and Ring Bridge Replacement Project
Sector: Bridge • Location: Everett, Washington, USA
Source: My Northwest
The Merrill and Ring Bridge, a 95-year-old vital bridge connecting Everett and Mukilteo, is planned for replacement as the third and final bridge in the Mukilteo corridor replacement plan. The project is in early stages with partial funding for construction and design expected to continue into 2028. Construction could begin in 2029 or 2030, pending funding and property acquisitions.
- Status
- Prospective
- Sector
- Bridge
- Location
- Everett, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- My Northwest
ConstructChat
Ask ConstructChat about Merrill and Ring Bridge Replacement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Merrill and Ring Bridge, a 95-year-old vital bridge connecting Everett and Mukilteo, is planned for replacement as the third and final bridge in the Mukilteo corridor replacement plan. The project is in early stages with partial funding for construction and design expected to continue into 2028. Construction could begin in 2029 or 2030, pending funding and property acquisitions. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | Washington |
City | Everett |
Source
Source | My Northwest |
URL |
More Details
Record type | Project |
Sector | Bridge |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in USA
- Widen Turnpike Mainline SR 91 from WPB Service Plaza to Okeechobee Blvd SR 704
- Widen Turnpike from Glades Rd to Atlantic Ave
- Add Auxiliary Lanes Turnpike TSMO from SR 821 to Griffin Road SR 818
- Widen Turnpike from Southern Blvd to Okeechobee Blvd
- Widen Turnpike from West Palm Beach Service Plaza to Southern Blvd
- Widen Turnpike Mainline from Neptune Road to Osceola Parkway
- Sand Lake Interchange
- Polk ParkwaySR 570 Bridge Painting Project in Polk County
