logo

Merritt - Coldwater River Flood Mitigation Pine Street Area

Sector: Water Supply and Storage • Location: British Columbia, Canada

Source: Infrastructure Canada

Project
Pre-Construction

The Merritt - Coldwater River Flood Mitigation Pine Street Area project (the Project) consists of the purchase, remediation, and restoration of approximately 5 hectares of riparian and riverbed habitat to increase capacity to adapt to climate change impacts, natural disasters, and/or extreme weather events. The project includes restoration of floodplain on the water side of the setback dike to all

Project Information FAQ

Project Information

5 Q
The project “Merritt - Coldwater River Flood Mitigation Pine Street Area” is an infrastructure initiative in the Water Supply and Storage sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

pre-construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Merritt - Coldwater River Flood Mitigation Pine Street Area project (the Project) consists of the purchase, remediation, and restoration of approximately 5 hectares of riparian and riverbed habitat to increase capacity to adapt to climate change impacts, natural disasters, and/or extreme weather events. The project includes restoration of floodplain on the water side of the setback dike to allow more room for the river, essentially widening the mouth of the Coldwater River where it meets the Nicola River. A section of the project includes bedload removal for conveyance improvements in this area as well. Acquisition of four private properties on the water side of the proposed diking structure will be required to accomplish this habitat restoration. The November 2021 Coldwater River Flood caused significant damage and failure of the water and wastewater utilities necessitating the evacuation of the entire City of Merritt. This project plus the rebuilding and extension of the existing dikes will serve to protect vital infrastructure in this corridor. The Project works include: - Bedload removal where sediment deposits from the November 2021 flood have inhibited water flow; - Property acquisition - 4 properties (600, 800, 801, and 1330 Pine Street), voluntary buyout at market value; - Hazardous building assessments, home demolition, and removal of materials; - Restoration of the land; - Relocation of the overhead utility pole; and, - Replacement of the FortisBC Gas Main that was damaged in the November 2021 flood.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data