logo

Mersey Bridge

Sector: Automotive • Location: United Kingdom

Source: FCC Construction

Project
Closed

The new Mersey Bridge project covers the design, construction, financing, maintenance and operation of the bridge over the River Mersey in Liverpool, the United Kingdom, which is intended to eliminate the traffic problems of the existing bridge.The new bridge will be 2.13 kilometres long and provide service to over 80,000 vehicles a day.FCC was the successful bidder through a consortium in which i

Project Information FAQ

Project Information

4 Q
The project “Mersey Bridge” is an infrastructure initiative in the Automotive sector, located in United Kingdom. Taiyo aggregates data on it from FCC Construction.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The new Mersey Bridge project covers the design, construction, financing, maintenance and operation of the bridge over the River Mersey in Liverpool, the United Kingdom, which is intended to eliminate the traffic problems of the existing bridge.The new bridge will be 2.13 kilometres long and provide service to over 80,000 vehicles a day.FCC was the successful bidder through a consortium in which it was participating, for both the concession and the construction. Its partners in the concession are Bilfinger, Sanef and Macquarie, whereas they are Samsung CT and Kier for the construction.The project consists of the construction of a new crossing over the River Mersey in Liverpool, with a total length of more than two kilometres, located to the east of the Silver Jubilee Bridge, which was opened in 1961 and currently suffering from serious traffic problems.The most singular element in the contract is the actual bridge itself, which is one kilometre long. It is a 42-metre wide braced structure with a maximum height of 125 metres. The project also includes the remodelling of seven kilometres of motorway access highways and the renovation of another 4.5 kilometres of motorway, together with various communication junctions.A free-flow multi-lane toll system will be installed at the crossings, which will enable toll fees to be collected by means of automatic reading of vehicles licence plates employing an advanced technological system that does not affect the traffic flow.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data