Merseyside waste PFI
One of 1,498 projects Taiyo tracks in UK (United Kingdom).
Source: InfraPPPWorld
The contract is to manage over 430,000 tonnes of residual household waste each year from Merseyside and Halton. It includes the design, build, finance and operation of two key facilities which both have planning permission in place: a rail loading waste transfer station in Merseyside and a new purpose-built energy-from-waste facility in Teesside.
- Status
- Under Construction
- Sector
- Water Supply and Storage, Rail
- Location
- United Kingdom
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Merseyside waste PFI
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | project in operation |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The contract is to manage over 430,000 tonnes of residual household waste each year from Merseyside and Halton. It includes the design, build, finance and operation of two key facilities which both have planning permission in place: a rail loading waste transfer station in Merseyside and a new purpose-built energy-from-waste facility in Teesside. |
Original sector | Water & Waste |
Procurement method | |
Budget |
Location
Country | United Kingdom (UK) |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Rail |
Article published date | 2025-03-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
