Merten Farms Residential Development Phase 2
Sector: Raw Materials • Location: Forward Township, Pennsylvania, United States of America
Source: Dodge USA
Merten Farms would be built along Marburger Road in Forward Township, near the border with Adams Township. The most recent plans for the development consist of 161 units across three planned phases. Phase 2 number of units TBD.
- Status
- Prospective
- Sector
- Raw Materials, Road, Residential, Commercial, Manufacturing (Industrial)
- Location
- Forward Township, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Merten Farms Residential Development Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Merten Farms would be built along Marburger Road in Forward Township, near the border with Adams Township. The most recent plans for the development consist of 161 units across three planned phases. Phase 2 number of units TBD. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Forward Township |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Road, Residential, Commercial, Manufacturing (Industrial) |
Article published date | 2024-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in United States of America
- SR 138@CR 55/NUNNALLY FARM RD RT TURN LN
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
- ROOFTOP SOLAR PV INSTALL. (8) 400W MODULES AT 3.2 KW TOTAL. INSTALL (1) (N) ESS TELSA POWERWALL BATTERY AT 13.5 KWH.
- LIVESTOCK AMENDMENTS
- CUP AND MSPR FOR NEW INDUSTRIAL CAMPUS WITH 2 SHELL BUILDING (232,653 AND 154,618 SF) AT FORMER BERKELEY FARMS SITE
- VINYL-LINER SWIMMING POOL LOCATED IN REAR YARD
- Dwight D. Eisenhower Memorial
