Merus Power 20 MW / 40 MWh Battery Storage Project in Riga
Sector: Power Generation (CCGT) • Location: Riga, Latvia
Source: pv Europe
Merus Power will deliver core technology for two battery storage projects in Riga, Latvia, with a combined capacity of 40 MWh and power of 20 MW. The systems will be installed for state energy company Latvenergo, with Latvian contractor Nordes Būve acting as the general contractor.
- Status
- Closed
- Sector
- Power Generation (CCGT), Energy Storage
- Location
- Riga, Latvia
- Updated
- 22 Jul 2026
- Source
- pv Europe
ConstructChat
Ask ConstructChat about Merus Power 20 MW / 40 MWh Battery Storage Project in Riga
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Merus Power will deliver core technology for two battery storage projects in Riga, Latvia, with a combined capacity of 40 MWh and power of 20 MW. The systems will be installed for state energy company Latvenergo, with Latvian contractor Nordes Būve acting as the general contractor. |
Original sector | Energy Storage |
Location
Country | Latvia |
City | Riga |
Source
Source | pv Europe |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Energy Storage |
Article published date | 2026-04-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
