logo

Merus Power 20 MW / 40 MWh Battery Storage Project in Riga

Sector: Power Generation (CCGT) • Location: Riga, Latvia

Source: pv Europe

Project
Awarded

Merus Power will deliver core technology for two battery storage projects in Riga, Latvia, with a combined capacity of 40 MWh and power of 20 MW. The systems will be installed for state energy company Latvenergo, with Latvian contractor Nordes Būve acting as the general contractor.

Status
Closed
Sector
Power Generation (CCGT), Energy Storage
Location
Riga, Latvia
Updated
22 Jul 2026
Source
pv Europe

ConstructChat

Ask ConstructChat about Merus Power 20 MW / 40 MWh Battery Storage Project in Riga

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Merus Power 20 MW / 40 MWh Battery Storage Project in Riga” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Riga, Latvia. Taiyo aggregates data on it from pv Europe.

Participants

Not available for this record.

Status

Original status

awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Merus Power will deliver core technology for two battery storage projects in Riga, Latvia, with a combined capacity of 40 MWh and power of 20 MW. The systems will be installed for state energy company Latvenergo, with Latvian contractor Nordes Būve acting as the general contractor.

Original sector

Energy Storage

Location

Country

Latvia

City

Riga

Source

Source

pv Europe

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Energy Storage

Article published date

2026-04-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project