Mesa Eastmark Great Park Phase V
Sector: Government • Location: Mesa, Arizona, United States of America
Source: Dodge
Phase V is the final phase of the Eastmark City Park system that will be constructed on rough - graded 24.76 - acre site on the south side of E Rubidium Ave between S Binary and S Signal Butte, tying into the existing disc golf area to the northwest, as well as neighborhood pedestrian connection to the west, and full vehicular and pedestrian access on Park Joule. The project consists of constructi
- Status
- Closed
- Sector
- Government, Car parking, Automotive, Commercial, Manufacturing (Industrial)
- Location
- Mesa, Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Mesa Eastmark Great Park Phase V
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Phase V is the final phase of the Eastmark City Park system that will be constructed on rough - graded 24.76 - acre site on the south side of E Rubidium Ave between S Binary and S Signal Butte, tying into the existing disc golf area to the northwest, as well as neighborhood pedestrian connection to the west, and full vehicular and pedestrian access on Park Joule. The project consists of constructing active and passive recreation areas including pathways and sidewalks, play s tructures for var... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
City | Mesa |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Government, Car parking, Automotive, Commercial, Manufacturing (Industrial) |
Article published date | 2025-08-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Government projects in United States of America
- CARTER TOWN ROAD
- DUDLEY-STATE ROUTE 29 ROAD
- CR 299/CCC CAMP ROAD @ EMERY CREEK 6.5 MI SE OF CRANDALL
- SR 202 FROM THOMAS COUNTY LINE TO SR 111
- CR 210/GLYEN HICKMAN RD FROM SR 117 TO CR 356/AIRPORT RD-TIA
- COLUMBUS VIADUCT RAILROAD BRIDGES.
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SIGNAL COMMUNICATIONS; SERVICE & SUPPORT - FY 2018
