Mesa Verde Mixed-Use Master Report
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
mixed use -projected number of units within each of the residential zones include: 790 units of High Residential, 594 units of Medium High, 1,450 units of Medium, 677 units of Low Medium, and 139 units of Low. The Project would allow up to 4.44 million square feet of building area within the Business Park zone (allowing for industrial, logistics, office, and/or educational uses), up to 300,000 squ
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Road, Hospital, Warehouse, Car parking, Education, Automotive, Residential, Consumer Products, Commercial
- Location
- Calimesa, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Mesa Verde Mixed-Use Master Report
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | design development |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | mixed use -projected number of units within each of the residential zones include: 790 units of High Residential, 594 units of Medium High, 1,450 units of Medium, 677 units of Low Medium, and 139 units of Low. The Project would allow up to 4.44 million square feet of building area within the Business Park zone (allowing for industrial, logistics, office, and/or educational uses), up to 300,000 square feet of commercial building area within the Commercial and Mixed-Use zones, two school sites,... |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Calimesa |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Road, Hospital, Warehouse, Car parking, Education, Automotive, Residential, Consumer Products, Commercial |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
