logo
ProjectPlanned

Meta Canada AI Data Center

Planned · Alberta · Last reported Jul 2026

Source: The Economic Times

Meta will invest C$13 billion (US$9.17 billion) to build its first Canadian AI data center in Sturgeon County, Alberta. The 1-gigawatt facility will consume electricity equivalent to 800,000 homes and will use a closed-loop liquid cooling system to minimize water consumption. Meta plans to offset the energy use with renewable energy projects. The project is part of Meta's global AI infrastructure

Status
Prospective
Sector
Power Generation (CCGT), Data Center, Water Supply and Storage
Location
Sturgeon County, Alberta, Canada
Updated
22 Jul 2026
Source
The Economic Times

ConstructChat

Ask ConstructChat about Meta Canada AI Data Center

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Meta Canada AI Data Center” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Sturgeon County, Alberta, Canada. Taiyo aggregates data on it from The Economic Times.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Meta will invest C$13 billion (US$9.17 billion) to build its first Canadian AI data center in Sturgeon County, Alberta. The 1-gigawatt facility will consume electricity equivalent to 800,000 homes and will use a closed-loop liquid cooling system to minimize water consumption. Meta plans to offset the energy use with renewable energy projects. The project is part of Meta's global AI infrastructure expansion and will be its 33rd data center worldwide.

Original sector

Technology

Budget

Location

Country

Canada

State

Alberta

City

Sturgeon County

Source

Source

The Economic Times

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Data Center, Water Supply and Storage

Article published date

2026-07-13

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project