Meta Canada AI Data Center
Planned · Alberta · Last reported Jul 2026
Source: The Economic Times
Meta plans to invest C$13 billion (US$9.17 billion) to build its first AI data center in Canada, located in Sturgeon County, Alberta. The 1-gigawatt facility will consume electricity equivalent to 800,000 homes and will use a closed-loop liquid cooling system to minimize water consumption. Meta aims to offset the energy use with clean and renewable energy projects. The project is part of Meta's gl
- Status
- Prospective
- Sector
- Power Generation (CCGT), Natural Gas, Data Center, Water Supply and Storage
- Location
- Sturgeon County, Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- The Economic Times
ConstructChat
Ask ConstructChat about Meta Canada AI Data Center
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Meta plans to invest C$13 billion (US$9.17 billion) to build its first AI data center in Canada, located in Sturgeon County, Alberta. The 1-gigawatt facility will consume electricity equivalent to 800,000 homes and will use a closed-loop liquid cooling system to minimize water consumption. Meta aims to offset the energy use with clean and renewable energy projects. The project is part of Meta's global AI infrastructure expansion and includes a long-term power supply agreement with Pembina Pipeline's Greenlight Electricity Centre, a natural gas-fired power plant. |
Original sector | Technology |
Budget |
Location
Country | Canada |
State | Alberta |
City | Sturgeon County |
Source
Source | The Economic Times |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Natural Gas, Data Center, Water Supply and Storage |
Article published date | 2026-07-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Canada
- Site C Worker Accommodation
- Canadian Tire Corporate Office Interior Renovation
- St. Stephen Border Crossing
- Brock University's Marilyn I. Walker School of Fine and Performing Arts
- Molson Brewery Expansion
- Air Products Hydrogen Plant Civil Construction
- Osgoode Hall Law School
- Toronto Airport Piers D and E Fixed Bridges
