logo

Meta Data Center Power Use from Intel Substation

Sector: Data Center • Location: New Albany, Ohio, United States

Source: The Business Journals

Project
Planned

AEP Ohio and Meta plan to redirect power from an unused Intel substation to a Meta data center due to delays in Intel's chip plant construction. Meta would use up to 250 megawatts from the substation temporarily from 2026 through 2028, with Intel regaining full 500 megawatts capacity in 2029. The arrangement ensures no additional costs to customers during the Intel delay.

Status
Prospective
Sector
Data Center, Power Generation (CCGT)
Location
New Albany, Ohio, United States of America
Updated
22 Jul 2026
Source
The Business Journals

ConstructChat

Ask ConstructChat about Meta Data Center Power Use from Intel Substation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Meta Data Center Power Use from Intel Substation” is an infrastructure initiative in the Data Center sector, located in New Albany, Ohio, United States. Taiyo aggregates data on it from The Business Journals.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

AEP Ohio and Meta plan to redirect power from an unused Intel substation to a Meta data center due to delays in Intel's chip plant construction. Meta would use up to 250 megawatts from the substation temporarily from 2026 through 2028, with Intel regaining full 500 megawatts capacity in 2029. The arrangement ensures no additional costs to customers during the Intel delay.

Original sector

Energy

Location

Country

United States of America (USA)

State

Ohio

City

New Albany

Source

Source

The Business Journals

URL

More Details

Record type

Project

Sector

Data Center, Power Generation (CCGT)

Article published date

2025-12-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project