Meta Hyperion AI Data Center
Sector: Power Generation (CCGT) • Location: Richland Parish, Louisiana, United States
Source: AOL
Meta is building a $10 billion AI data center named Hyperion in Richland Parish, Louisiana. The data center will cover 2,250 acres of former state-owned farmland and is designed to power Meta's Llama AI models. The project received a $3.3 billion tax break exempting it from state and local sales and use taxes on data center equipment for 20 years. Meta has pledged $200 million in local infrastruct
- Status
- Prospective
- Sector
- Power Generation (CCGT), Power Transmission, Commercial, Data Center
- Location
- Richland Parish, Louisiana, United States of America
- Updated
- 22 Jul 2026
- Source
- AOL
ConstructChat
Ask ConstructChat about Meta Hyperion AI Data Center
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Meta is building a $10 billion AI data center named Hyperion in Richland Parish, Louisiana. The data center will cover 2,250 acres of former state-owned farmland and is designed to power Meta's Llama AI models. The project received a $3.3 billion tax break exempting it from state and local sales and use taxes on data center equipment for 20 years. Meta has pledged $200 million in local infrastructure improvements, $1 million annually to Entergy's low-income ratepayer support program, and 1,500 megawatts of renewable energy in partnership with the utility. The data center could consume close to 20% of Louisiana's total electricity, prompting concerns about energy costs and infrastructure. |
Original sector | Technology |
Budget |
Location
Country | United States of America (USA) |
State | Louisiana |
City | Richland Parish |
Source
Source | AOL |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Power Transmission, Commercial, Data Center |
Article published date | 2026-05-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States
- EPC of Turbine and Foundation Structure in the Southwest Sea Wind Power Demonstration Complex
- Engineering, Procurement, and Construction of Third Bosphorus Bridge
- Tampa Bay Seawater Desalination Plant
- Carlsbad Desalination Project, San Diego, California
- Joint Base Lewis-McChord
- Fort Benning, Georgia
- Naval Base San Diego, California
- Dover Air Force Base
