Metal Bridge Railing Replacement
Sector: Metal • Location: Amherst, Massachusetts, United States of America
Source: Dodge USA
Procurement of approximately 120 linear feet of Metal Bridge Rail to replace the existing Type ST-3 bridge rail on the West Street Bridge over the Fort River (State Bridge ID A-08-003). Typical post spacing is approximately 6 ft on center with varied end post spacing. The rail shall be constructed in six parts with allowance for five expansion joints as shown on the attached Record Plan and Rail S
- Status
- Closed
- Sector
- Metal, Bridge, Rail, Road, Mass Transit, Government, Commercial
- Location
- Amherst, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Metal Bridge Railing Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Procurement of approximately 120 linear feet of Metal Bridge Rail to replace the existing Type ST-3 bridge rail on the West Street Bridge over the Fort River (State Bridge ID A-08-003). Typical post spacing is approximately 6 ft on center with varied end post spacing. The rail shall be constructed in six parts with allowance for five expansion joints as shown on the attached Record Plan and Rail Spacing Plan. All replacement rails and posts provided shall meet Mass DOT Standard Specifications... |
Procurement method |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Amherst |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Bridge, Rail, Road, Mass Transit, Government, Commercial |
Article published date | 2024-06-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- Shivwits Band of Paiutes Fiber Ring Connectivity Project
- PARTIAL METAL BEAM REPLACEMENT DUE TO FIRE DAMAGE, ROOF REPLACEMENT WORK DUE TO FIRE DAMAGE
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- TO CONSTRUCT 15,000 SF PRE-FAB METAL BUILDING AND ASSOCIATED SITE IMPROVEMENTS (1069 & 1089 INDUSTRIAL)
- Willard InterContinental Hotel
- Pacific Visions Wing at the Aquarium of the Pacific
