logo

Meta's 1 GW AI Campus in Alberta

Sector: Data Center • Location: Sturgeon County, Alberta, Canada

Source: Indiatimes

Project
Planned

Meta is investing over US$9 billion to develop a 1 gigawatt artificial intelligence campus in Sturgeon County, Alberta, Canada. The project includes securing power and transmission infrastructure years in advance, fully funding new generation and grid infrastructure to support the data center, and using closed-loop liquid cooling to eliminate operational water use for cooling. The campus is expect

Status
Prospective
Sector
Data Center, Power Generation (CCGT), Water Supply and Storage
Location
Sturgeon County, Alberta, Canada
Updated
22 Jul 2026
Source
Indiatimes

ConstructChat

Ask ConstructChat about Meta's 1 GW AI Campus in Alberta

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Meta's 1 GW AI Campus in Alberta” is an infrastructure initiative in the Data Center sector, located in Sturgeon County, Alberta, Canada. Taiyo aggregates data on it from Indiatimes.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Meta is investing over US$9 billion to develop a 1 gigawatt artificial intelligence campus in Sturgeon County, Alberta, Canada. The project includes securing power and transmission infrastructure years in advance, fully funding new generation and grid infrastructure to support the data center, and using closed-loop liquid cooling to eliminate operational water use for cooling. The campus is expected to create approximately 3,000 construction jobs at peak and over 300 permanent positions, with an additional investment of around US$42.3 million in local road and water infrastructure.

Original sector

Energy, Cooling & Sustainability

Budget

Location

Country

Canada

State

Alberta

City

Sturgeon County

Source

Source

Indiatimes

URL

More Details

Record type

Project

Sector

Data Center, Power Generation (CCGT), Water Supply and Storage

Article published date

2026-07-12

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project