logo

Meta's First Canadian Data Centre in Sturgeon County

Sector: Power Generation (CCGT) • Location: Sturgeon County, Alberta, Canada

Source: Benefits and Pensions Monitor

Project
Planned

Meta will build its first Canadian data centre in Sturgeon County, Alberta, with a total investment of $13 billion. The facility will draw about as much electricity as 800,000 homes and will be powered by a new natural gas-fired plant and existing natural gas supply until the new plant is operational. The project is expected to create 3,000 construction jobs and 300 permanent positions, with addit

Status
Prospective
Sector
Power Generation (CCGT), Natural Gas, Data Center
Location
Sturgeon County, Alberta, Canada
Updated
22 Jul 2026
Source
Benefits and Pensions Monitor

ConstructChat

Ask ConstructChat about Meta's First Canadian Data Centre in Sturgeon County

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Meta's First Canadian Data Centre in Sturgeon County” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Sturgeon County, Alberta, Canada. Taiyo aggregates data on it from Benefits and Pensions Monitor.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Meta will build its first Canadian data centre in Sturgeon County, Alberta, with a total investment of $13 billion. The facility will draw about as much electricity as 800,000 homes and will be powered by a new natural gas-fired plant and existing natural gas supply until the new plant is operational. The project is expected to create 3,000 construction jobs and 300 permanent positions, with additional investments in local infrastructure.

Original sector

Technology

Budget

Location

Country

Canada

State

Alberta

City

Sturgeon County

Source

Source

Benefits and Pensions Monitor

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Natural Gas, Data Center

Article published date

2026-07-13

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project