logo

Metcalfe Street Reconstruction - Phase 1

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

The proposed phase 1 of the Metcalfe Street Reconstruction project will commence the rehabilitation of a 1.2KM stretch of Metcalfe Street to improve municipal water supply to citizens and businesses, alleviate historical flooding, protect source water and replace aging underground infrastructure (water, wastewater and stormwater). Increasing flow capacity with new infrastructure will improve munic

Status
Closed
Sector
Water Supply and Storage, Government, Road, Hospital
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Metcalfe Street Reconstruction - Phase 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Metcalfe Street Reconstruction - Phase 1” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed phase 1 of the Metcalfe Street Reconstruction project will commence the rehabilitation of a 1.2KM stretch of Metcalfe Street to improve municipal water supply to citizens and businesses, alleviate historical flooding, protect source water and replace aging underground infrastructure (water, wastewater and stormwater). Increasing flow capacity with new infrastructure will improve municipal water supply in the North end of Guelph, including providing a direct line from the well to the watermain that supplies the Guelph General Hospital. This will allow for a total of three separate supply lines to the hospital and thus reduce water supply risks. The existing well is currently underutilized due to limited capacity in the local watermain system. A large 400 millimetre watermain is proposed from the well on Metcalfe Street to Speedvale Avenue which will connect the well to the 400 millimetre watermain distribution on Speedvale, thus allowing Water Services to maximize flow from the well to the local area. The sanitary sewers on the street are at the end of their service life and would benefit from the asset management proposed in this submission. The storm sewers also require increased capacity to alleviate localized flooding, as identified in the City’s Stormwater Management Master Plan. The project will contribute to economic growth while supporting a cleaner and healthier environment in Guelph. Economic outcomes are enhanced by ensuring the project is undertaken quickly, and reduces the risk of a system failure in the future which would require costly repairs and emergency service. Phase 1 Final Design work would start October 2016 with construction April - September 2017. Phase 1 costs are estimated at $3.6 million while the entire project is projected to cost $7.6 million once completed.

Original sector

Drinking Water and Wastewater

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Road, Hospital

Article published date

2026-05-31

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project