Meter & Pipeline Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The Project would improve the existing water distribution system within the Madera Ranchos Maintenance District 10A (MD10A) through the installation of new and replacement water distribution pipelines, water meters, and fire hydrants. The Project would install up to approximately 41.21 miles (221,760 linear feet) of pipeline primarily within existing public rights-of-way and install new meter conn
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Commercial, Government, Manufacturing (Industrial)
- Location
- Madera, California, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Meter & Pipeline Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The Project would improve the existing water distribution system within the Madera Ranchos Maintenance District 10A (MD10A) through the installation of new and replacement water distribution pipelines, water meters, and fire hydrants. The Project would install up to approximately 41.21 miles (221,760 linear feet) of pipeline primarily within existing public rights-of-way and install new meter connections to existing and additional customers within MD10A, providing water service to all 1,347 p... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Madera |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Commercial, Government, Manufacturing (Industrial) |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
