Meter Box Replacement REBID
One of 10,000+ projects Taiyo tracks in Florida.
Source: Dodge
Remove existing water (potable and reclaimed/reuse) meter boxes and replace with new HDPE meter boxes on existing 5/8" , 3/4" , 1" , 1-1/2" and 2" meters. Materials to construct the meter box assemblies (boxes and brass fittings) will be provided by the District. Service line verification required. Any meter boxes located in hardscape areas will require a saw cut to complete.
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Commercial, Government
- Location
- Fort Myers, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Meter Box Replacement REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Remove existing water (potable and reclaimed/reuse) meter boxes and replace with new HDPE meter boxes on existing 5/8" , 3/4" , 1" , 1-1/2" and 2" meters. Materials to construct the meter box assemblies (boxes and brass fittings) will be provided by the District. Service line verification required. Any meter boxes located in hardscape areas will require a saw cut to complete. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Fort Myers |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Commercial, Government |
Article published date | 2025-01-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
