Metro Manila Flood Management Project
Active · Philippines
Source: World Bank
The development objective of the Metro Manila Flood Management Project for Philippines is to improve flood management in selected areas of metro manila. The project comprises of four components. The first component, modernizing drainage areas will construct an estimated 20 new and modernize an estimated 36 existing pumping stations and appurtenant infrastructure, improve the associated waterways a
- Status
- Prospective
- Sector
- Mass Transit, Water Supply and Storage, Road, Biomass, Forest Products and Packaging, Residential, Waste Processing and Treatment, Government
- Location
- Philippines
- Updated
- 19 Nov 2026
- Source
- World Bank
ConstructChat
Ask ConstructChat about Metro Manila Flood Management Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The development objective of the Metro Manila Flood Management Project for Philippines is to improve flood management in selected areas of metro manila. The project comprises of four components. The first component, modernizing drainage areas will construct an estimated 20 new and modernize an estimated 36 existing pumping stations and appurtenant infrastructure, improve the associated waterways and drainage channels, including secondary and tertiary ones as needed, and develop new drains when required. The second component, minimizing solid waste in waterways will carry out neighborhood-level activities near the pumping stations and waterways and drainage channels targeted under component 1 of the project. The third component, participatory housing and resettlement will support three groups of project affected people. Group 1 refers to project affected people (PAPs) who were resettled before December 8, 2014 (the date of the announcement of the project identification mission). Group 2 refers to PAPs that were resettled from technical footprints from December 8, 2014 to project effectiveness. Group 3 refers to PAPs that will be resettled from technical footprints after project effectiveness. The fourth component, project management and coordination will provide support for the operation of the project management offices in department of public works and highways (DPWH) and metropolitan manila development authority (MMDA) with respect to the management and coordination of their respective parts of the project. |
Original sector | FY17 - Industry, Trade and Services,FY17 - Social Protection,FY17 - Water, Sanitation and Waste Management |
Budget |
Location
Country | Philippines |
Source
Source | World Bank |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Water Supply and Storage, Road, Biomass, Forest Products and Packaging, Residential, Waste Processing and Treatment, Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
