Metro Manila Skyway

Sector: Automotive • Location: Philippines

Source: Road Traffic Technology

Project
Closed

The Metro Manila Skyway crosses through Makati City, Pasay City and Parañaque City Metro Manila Skyway of the South Luzon Expressway looking northbound. The Skyway operations are being carried out by SOMCo. The construction works of Stage two started in 2009. Southbound lane of the Metro Manila Skyway. The Metro Manila Skyway is located within the National Capital Region Metro Manila. The elevated

Project Information FAQ

Project Information

4 Q
The project “Metro Manila Skyway” is an infrastructure initiative in the Automotive sector, located in Philippines. Taiyo aggregates data on it from Road Traffic Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Metro Manila Skyway crosses through Makati City, Pasay City and Parañaque City Metro Manila Skyway of the South Luzon Expressway looking northbound. The Skyway operations are being carried out by SOMCo. The construction works of Stage two started in 2009. Southbound lane of the Metro Manila Skyway. The Metro Manila Skyway is located within the National Capital Region Metro Manila. The elevated expressway crosses through Makati City, Pasay City and Parañaque City in the Philippines. The Skyway begins in Barangay San Isidro, Makati City and terminates at Barangay San Martin de Porres in Parañaque City. The expressway was initially operated by PNCC Skyway. In 2008, SOMCo (Skyway Operations and Maintenance Corporation) took over as the operator. Construction of the expressway is being undertaken in three phases. Stage one involved the rehabilitation of the 13.5km section of Magallanes-Alabang and also construction of a six-lane Expressway from Buendia to Bicutan. Called the Metro Manila Skyway System, the six-lane, 10km-long elevated expressway extends from Buendia to Bicutan. Stage two involved the construction of a 6.88km-long expressway from Bicutan to Alabang, which extends from the 9.5km toll road from Makati to Bicutan. The construction work initially began at the San Martin de Porres Temporary Exit Ramp. In Stage two, the Skyway crosses Muntinlupa City. The six-lane Main Toll Plaza between Sucat and Alabang replaces the temporary Skyway Toll Plazas at the NAIA flight path. The six-lane Main Toll Plaza between Sucat and Alabang replaces the temporary Skyway Toll Plazas at the NAIA flight path. Stage three involves the construction of a 13.24km connector road, 10.54km of which will run right over the Philippine National Railway tracks and 2.7km over the Osmeña Highway. The construction involves linking the missing segment between Buendia and Balintawak. The road will be connected in the north to Segment 10, which will be constructed through the cities of Caloocan and Valenzuela. The connector road is expected to have four entry and exit points at the C-3 Road in Caloocan, Buendia in Makati and España, and Quirino Avenue in Manila. The project is expected to attract more investments to the south of the Manila area. It will also enhance trade, delivery of goods and services situated in Metro Manila and Southern Luzon. The $514m construction of stage one started in April 1995 and was completed in October 1999. Construction works of stage two started in 2009 and were completed by mid-2011. The section of Bicutan to Sucat, including the slip ramps was completed in 2015. It is part of the South Luzon Expressway expansion. Upon completion of stage two, the San Martin de Porres temporary exit was removed and vehicles exit in Sucat and Alabang. Stage two created 2,500 jobs and more employment is expected to be created by the time of completion of the project. The proposal for the construction of stage three was put forward by Metro Pacific Tollways Development Corp. (MPTDC), a subsidiary of Pacific Tollways Corp. (MPTC). Construction started in 2014 and is expected to be completed by 2019. The lead contractor for stage one was Hutama – RSEA J.O. Philippines-based FF Cruz Construction Corporation was awarded the contract for stage two. However, due to delays in construction, the contract was cancelled and was awarded to DM Consunji, Inc. (DMCI) in March 2009. The project is being managed by a consortium of Renardet. US-based Pertconsult International is acting as the independent consultant. The design consultant for the project is JF Cancio Assc. Citra Metro Manila Tollways Corporation is acting as the proponent for the Skyway project.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data