logo
ProjectProject In Construction

Metro mover system PPP project in Miami-Dade county

One of 10,000+ projects Taiyo tracks in Florida.

Source: InfraPPPWorld

This project includes the development and refurbishment works for the comprehensive wayside system overhaul for the Metromover system in Miami-Dade county.Metromover began operating 32 years ago. The system has expanded and vehicle fleet has been replaced, however, many major subsystems that makeup the system have not been replaced of refurbished and have now reached the end of its design life. Th

Status
Under Construction
Sector
Power Generation (CCGT), Rail, Manufacturing (Industrial), Mass Transit, Government
Location
Florida, United States of America
Updated
22 Jul 2026
Source
InfraPPPWorld

ConstructChat

Ask ConstructChat about Metro mover system PPP project in Miami-Dade county

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Metro mover system PPP project in Miami-Dade county” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Florida, (USA) United States of America. Taiyo aggregates data on it from InfraPPPWorld.

Participants

Sponsoring Agency

Status

Original status

project in construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project includes the development and refurbishment works for the comprehensive wayside system overhaul for the Metromover system in Miami-Dade county.Metromover began operating 32 years ago. The system has expanded and vehicle fleet has been replaced, however, many major subsystems that makeup the system have not been replaced of refurbished and have now reached the end of its design life. These systems include Automatic Train Control (ATC) system, Data Transmissive System (DTS), several Power Distribution System (PDS) elements, guideway switch equipment, and Central Control equipment. The Comprehensive Wayside System 1overhaul Project will include the design, supply manufacture, installation, testing and commissioning of the APM System into a fully functional Metromover System that will meet all of the requirements outlined in the solicitation.

Original sector

Transport

Procurement method

Budget

Location

Country

United States of America (USA)

State

Florida

Source

Source

InfraPPPWorld

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Rail, Manufacturing (Industrial), Mass Transit, Government

Article published date

2025-02-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project