logo

Metro Tunnel Project in Victoria, Australia

Sector: Cement • Location: Melbourne, Australia

Source: Highways Today

Project
Ongoing

An international search is underway for a supplier to build the four massive Tunnel Boring Machines (TBM) that will build Australia’s biggest ever public transport project – the Metro Tunnel in Victoria. The four TBMs needed for the $11 billion project will be more than 100 metres long, weigh up to 1,000 tonnes and be custom-built to grind through Melbourne’s unique ground conditions. It will take

Project Information FAQ

Project Information

5 Q
The project “Metro Tunnel Project in Victoria, Australia” is an infrastructure initiative in the Cement sector, located in Melbourne, Australia. Taiyo aggregates data on it from Highways Today.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

An international search is underway for a supplier to build the four massive Tunnel Boring Machines (TBM) that will build Australia’s biggest ever public transport project – the Metro Tunnel in Victoria. The four TBMs needed for the $11 billion project will be more than 100 metres long, weigh up to 1,000 tonnes and be custom-built to grind through Melbourne’s unique ground conditions. It will take up to 18 months to build the mammoth machines before they’re tested and shipped in segments to Melbourne. They will then be delivered to launch sites at Arden and Domain, where they will be lowered into the ground and reassembled on-site by local workers. They will be in the ground, operating 24/7 in 2019. As they work up to 40 metres below Melbourne’s surface, they will progressively install concrete linings to support the excavated tunnel. Each TBM will include offices, kitchens and toilets, and be operated around the clock by a crew of around 15 people. The project will create nearly 7,000 local jobs and will be completed in 2026.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data