logo

Metro Wind Power Project

Sector: Mass Transit • Location: Pakistan

Source: World Bank Group

Project
Active

Metro Wind Power Project is a 50MW facility located in the Jhimpir Wind Corridor of the Thatta District, Sindh Province, Pakistan and run by the SPV, Metro Power Company Limited.

Metro Power Company Limited is owned by the Iqbal Alimohamed family (%45.1), InfraCo (%45.1), and the IFC (%9.8). The Metro Wind Power Project received a 20yr license from the National Electric Power Regulatory Authority

Status
Prospective
Sector
Mass Transit, Wind, Raw Materials, Power Generation (CCGT), Government, Commercial
Location
Pakistan
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Metro Wind Power Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Metro Wind Power Project” is an infrastructure initiative in the Mass Transit sector, located in Pakistan. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Metro Wind Power Project is a 50MW facility located in the Jhimpir Wind Corridor of the Thatta District, Sindh Province, Pakistan and run by the SPV, Metro Power Company Limited. Metro Power Company Limited is owned by the Iqbal Alimohamed family (%45.1), InfraCo (%45.1), and the IFC (%9.8). The Metro Wind Power Project received a 20yr license from the National Electric Power Regulatory Authority in 2014. Metro Power Company Limited has entered into a 20yr EPA with the National Transmission & Dispatch Company. Metro Wind Power Project reached financial closure in February, 2015. Of the projected $130.16m USD cost, $20.16m USD is to be financed through equity and $110m USD is to be financed through debt. Equity is provided by the Iqbal Alimohamed family ($8.43m USD), InfraCo ($8.43m USD), and the IFC ($3.3m USD). Debt financing is provided by the IFC ($22.5m USD), ECO Trade and Development Bank ($22.5m USD),the National Bank of Pakistan ($16.25m USD), United Bank Limited of Pakistan ($16.25m USD), Askari Bank ($16.25m USD), and Alfalah Bank ($16.25m USD). Metro Wind Power Project is expected to start producing electricity by the end of 2015. Check status of production in the beginning of 2015 Sources: IFC: http://ifcextapps.ifc.org/ifcext/spiwebsite1.nsf/651aeb16abd09c1f8525797d006976ba/5e94a89f2d325dfe85257bcf006854ec?opendocument IJ Global: https://ijglobal.com/data/transaction/30039/metro-power-sindh-wind-farm-50mw InfraCo Websiter: http://www.infracoasia.com/news.asp?id=12 Private Infrastructure Development Group: http://www.pidg.org/impact/case-studies/metro-wind-power-pakistan National Electric Power Regulatory Authority: http://www.nepra.org.pk/Licences/Generation/RE-2006/LAG-194%20licence%20of%20Metro%20Energy%20Dated%2026-12-2011.PDF

Original sector

Energy

Budget

Location

Country

Pakistan

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Mass Transit, Wind, Raw Materials, Power Generation (CCGT), Government, Commercial

Article published date

2024-09-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project