Metro Wind Power Project
Sector: Mass Transit • Location: Sindh, Pakistan
Source: World Bank Group
Metro Wind Power Project is a 50MW facility located in the Jhimpir Wind Corridor of the Thatta District, Sindh Province, Pakistan and run by the SPV, Metro Power Company Limited.
Metro Power Company Limited is owned by the Iqbal Alimohamed family (%45.1), InfraCo (%45.1), and the IFC (%9.8). The Metro Wind Power Project received a 20yr license from the National Electric Power Regulatory Authority
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Metro Wind Power Project is a 50MW facility located in the Jhimpir Wind Corridor of the Thatta District, Sindh Province, Pakistan and run by the SPV, Metro Power Company Limited. Metro Power Company Limited is owned by the Iqbal Alimohamed family (%45.1), InfraCo (%45.1), and the IFC (%9.8). The Metro Wind Power Project received a 20yr license from the National Electric Power Regulatory Authority in 2014. Metro Power Company Limited has entered into a 20yr EPA with the National Transmission & Dispatch Company. Metro Wind Power Project reached financial closure in February, 2015. Of the projected $130.16m USD cost, $20.16m USD is to be financed through equity and $110m USD is to be financed through debt. Equity is provided by the Iqbal Alimohamed family ($8.43m USD), InfraCo ($8.43m USD), and the IFC ($3.3m USD). Debt financing is provided by the IFC ($22.5m USD), ECO Trade and Development Bank ($22.5m USD),the National Bank of Pakistan ($16.25m USD), United Bank Limited of Pakistan ($16.25m USD), Askari Bank ($16.25m USD), and Alfalah Bank ($16.25m USD). Metro Wind Power Project is expected to start producing electricity by the end of 2015. Check status of production in the beginning of 2015 Sources: IFC: http://ifcextapps.ifc.org/ifcext/spiwebsite1.nsf/651aeb16abd09c1f8525797d006976ba/5e94a89f2d325dfe85257bcf006854ec?opendocument IJ Global: https://ijglobal.com/data/transaction/30039/metro-power-sindh-wind-farm-50mw InfraCo Websiter: http://www.infracoasia.com/news.asp?id=12 Private Infrastructure Development Group: http://www.pidg.org/impact/case-studies/metro-wind-power-pakistan National Electric Power Regulatory Authority: http://www.nepra.org.pk/Licences/Generation/RE-2006/LAG-194%20licence%20of%20Metro%20Energy%20Dated%2026-12-2011.PDF |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
