Metro Wind Power Project
Sector: Mass Transit • Location: Pakistan
Source: World Bank Group
Metro Wind Power Project is a 50MW facility located in the Jhimpir Wind Corridor of the Thatta District, Sindh Province, Pakistan and run by the SPV, Metro Power Company Limited.
Metro Power Company Limited is owned by the Iqbal Alimohamed family (%45.1), InfraCo (%45.1), and the IFC (%9.8). The Metro Wind Power Project received a 20yr license from the National Electric Power Regulatory Authority
- Status
- Prospective
- Sector
- Mass Transit, Raw Materials, Wind, Power Generation (CCGT), Government, Commercial
- Location
- Pakistan
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Metro Wind Power Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Metro Wind Power Project is a 50MW facility located in the Jhimpir Wind Corridor of the Thatta District, Sindh Province, Pakistan and run by the SPV, Metro Power Company Limited. Metro Power Company Limited is owned by the Iqbal Alimohamed family (%45.1), InfraCo (%45.1), and the IFC (%9.8). The Metro Wind Power Project received a 20yr license from the National Electric Power Regulatory Authority in 2014. Metro Power Company Limited has entered into a 20yr EPA with the National Transmission & Dispatch Company. Metro Wind Power Project reached financial closure in February, 2015. Of the projected $130.16m USD cost, $20.16m USD is to be financed through equity and $110m USD is to be financed through debt. Equity is provided by the Iqbal Alimohamed family ($8.43m USD), InfraCo ($8.43m USD), and the IFC ($3.3m USD). Debt financing is provided by the IFC ($22.5m USD), ECO Trade and Development Bank ($22.5m USD),the National Bank of Pakistan ($16.25m USD), United Bank Limited of Pakistan ($16.25m USD), Askari Bank ($16.25m USD), and Alfalah Bank ($16.25m USD). Metro Wind Power Project is expected to start producing electricity by the end of 2015. Check status of production in the beginning of 2015 Sources: IFC: http://ifcextapps.ifc.org/ifcext/spiwebsite1.nsf/651aeb16abd09c1f8525797d006976ba/5e94a89f2d325dfe85257bcf006854ec?opendocument IJ Global: https://ijglobal.com/data/transaction/30039/metro-power-sindh-wind-farm-50mw InfraCo Websiter: http://www.infracoasia.com/news.asp?id=12 Private Infrastructure Development Group: http://www.pidg.org/impact/case-studies/metro-wind-power-pakistan National Electric Power Regulatory Authority: http://www.nepra.org.pk/Licences/Generation/RE-2006/LAG-194%20licence%20of%20Metro%20Energy%20Dated%2026-12-2011.PDF |
Original sector | Energy |
Budget |
Location
Country | Pakistan |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Raw Materials, Wind, Power Generation (CCGT), Government, Commercial |
Article published date | 2024-10-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Mass Transit projects in Pakistan
- Metro Wind Thatta District Onshore Wind Farm
- Metro Wind Power Project
- Peshawar-Karachi Motorway (PKM) Project
- Orange Line Metro Train Project
- Karachi Light Rail - Brown Line Project, Sindh
- Jhimpir - Metro Power Wind Power Project
- Karachi - Peshawar Railway (Mainline-1) Upgrade Project
- Dasu Hydropower Project Phase I
