MetroBikeLink Trail Extension
Sector: Mass Transit • Location: Shiloh, Illinois, United States
Source: Illinois Business Journal
A $6 million, 4.5-mile extension of the MetroBikeLink Trail running parallel to the MetroLink alignment from Shiloh-Scott Transit Center to near MidAmerica St. Louis Airport. The trail features scenic views, rolling inclines, three bridges, and passes through Silver Creek Wetlands. It is part of the MetroLink Expansion Project to MidAmerica St. Louis Airport.
- Status
- Closed
- Sector
- Mass Transit, Airport
- Location
- Shiloh, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Illinois Business Journal
ConstructChat
Ask ConstructChat about MetroBikeLink Trail Extension
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A $6 million, 4.5-mile extension of the MetroBikeLink Trail running parallel to the MetroLink alignment from Shiloh-Scott Transit Center to near MidAmerica St. Louis Airport. The trail features scenic views, rolling inclines, three bridges, and passes through Silver Creek Wetlands. It is part of the MetroLink Expansion Project to MidAmerica St. Louis Airport. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Shiloh |
Source
Source | Illinois Business Journal |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Airport |
Article published date | 2026-07-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
