logo

Metsamor Nuclear Power Plant

Sector: Geothermal • Location: Armenia

Source: World Bank Group

Project
Active

Armenian government transferred financial and management control of the Metsamor Nuclear Power Plant (Metsamor) to the majority state-owned Russian Unified Energy System (UES) for a five-year period as a part of a deal reached between the Russian and Armenian governments to pay off Armenia’s US$40 million debt for the nuclear fuel supplied.

Metsamor is located in Armavir Marz about 28 kilomete

Project Information FAQ

Project Information

4 Q
The project “Metsamor Nuclear Power Plant” is an infrastructure initiative in the Geothermal sector, located in Armenia. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Armenian government transferred financial and management control of the Metsamor Nuclear Power Plant (Metsamor) to the majority state-owned Russian Unified Energy System (UES) for a five-year period as a part of a deal reached between the Russian and Armenian governments to pay off Armenia’s US$40 million debt for the nuclear fuel supplied. Metsamor is located in Armavir Marz about 28 kilometers west of Yerevan and 16 kilometers from the Turkish border. The facility with a two VVER-440 reactors was commissioned in 1979 and it had capacity of 815 MW installed in two units and a design life of 30 years. The operation of the plant was halted in 1989 after a major earthquake, though it wasn't damaged. In 1995 the second unit of Metsamor was rehabilitated and re-commissioned. The unit had, however, operated at less than full (407.5 MW) capacity most of the time. The plant supplied almost one-third of Armenia’s electric power in 2003. In 2009, the contract was extended until 2013. For other power plants transferred to Russian UES see also: Sevan-Hrazdan cascade of hydro power stations (2003) Hrazdan thermal power plant (potential 2004)

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data