Mexico City Insurgentes Bus Rapid Transit System Carbon Finance Project
Sector: Mass Transit • Location: Mexico
Source: World Bank Group
The Mexico City Insurgentes Bus Rapid Transit System Carbon Finance Project will contribute to reductions in local airborne pollutants and greenhouse gas emissions generated by the transport sector in the Metropolitan Area of Mexico City. This will be sought through the development of the first surface mass transport corridor in Mexico City (Insurgentes Avenue) and associated traffic management me
- Status
- Closed
- Sector
- Mass Transit, Road, Automotive, Government, Car parking
- Location
- Mexico
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Mexico City Insurgentes Bus Rapid Transit System Carbon Finance Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Mexico City Insurgentes Bus Rapid Transit System Carbon Finance Project will contribute to reductions in local airborne pollutants and greenhouse gas emissions generated by the transport sector in the Metropolitan Area of Mexico City. This will be sought through the development of the first surface mass transport corridor in Mexico City (Insurgentes Avenue) and associated traffic management measures. The project is also intended to develop and demonstrate the catalytic use of Clean Development Mechanism to foster technology, regulatory and institutional changes in the public transport sector. It will also develop and implement tools required to measure and monitor greenhouse gas emission reductions from the transport sector. There are two project components. Component 1 develops a mass transport corridor on Insurgentes Avenue, including the development of traffic management measures and of a professional management structure. The mass transport corridor of Insurgentes will be supported through the purchase of resulting greenhouse gas emission reductions. The corridor includes: a) Exclusive bus lanes; b) Elevated bus stations for high platform vehicles; c) Pedestrian facilities leading to the bus stations of the transport corridor; d) Concessions of the services on the corridor to a restructured company using large and low-polluting buses; and e) Promotion of low pollution passenger transport vehicles and scrapping programs for old vehicles on Insurgentes. Component 2 consists of monitoring and planning transport corridors and linkage to bikeways. CDM (Clean Development Mechanism) revenues will be used to finance the monitoring of performance of the corridors, measuring impacts on local criteria pollutants and other performance indicators and providing resources for planning of future replication of the program. These activities assume great importance given the pilot nature of the development objectives of the project and the plans for further replication. Monitoring of greenhouse gas emission reductions will be covered under the Emission Reductions Purchase Agreement. Monitoring of local airborne pollutants and performance indicators will provide necessary information to optimize the system and plan its expansion. CDM revenues will also be used to build and maintain bicycle parking and storage facilities at terminal stations of the corridor. |
Original sector | Transportation |
Budget |
Location
Country | Mexico |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Road, Automotive, Government, Car parking |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
