Meybod Solar Power Plant Phase I
Sector: Power Generation (CCGT) • Location: Iran, Islamic Rep.
Source: World Bank Group
The project envisages the construction and operation of a 10 MW solar plant in Meybod region, province of Yazd. This is the first phase of the planned 100 MW solar complex. Phase II will have a capacity of 90 MW. Pasargad Solar Projects Ltd in collaboration with Kronos Solar Projects GmbH launched the construction of the first phase in October 2017. The costs for Phase I is an estimated $12 milli
- Status
- Prospective
- Sector
- Power Generation (CCGT), Solar, Commercial, Government
- Location
- Iran
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Meybod Solar Power Plant Phase I
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project envisages the construction and operation of a 10 MW solar plant in Meybod region, province of Yazd. This is the first phase of the planned 100 MW solar complex. Phase II will have a capacity of 90 MW. Pasargad Solar Projects Ltd in collaboration with Kronos Solar Projects GmbH launched the construction of the first phase in October 2017. The costs for Phase I is an estimated $12 million and is fully funded by the German partner. Project will benefit from a 20-year PPA with National grid. The commissioning of the new plant is expected by Q1 2018. http://www.parsiabds.com/launch-construction-new-solar-power-plant-meybod-yazd/ http://www.persiadigest.com/Germans-finance-solar-power-plant https://www.txfnews.com/Tracker/Details/b7d3a15f-8af5-4c50-bcd4-d6db87df2d71/German-Iranian-joint-venture-plans-500MW-Meybod-solar-project |
Original sector | Energy |
Budget |
Location
Country | Iran |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Solar, Commercial, Government |
Article published date | 2024-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
