MFWQTC Secondary Load Centers Replacement
One of 10,000+ projects Taiyo tracks in Kentucky.
Source: Dodge USA
Description and location of Project: Project includes replacement of two existing electrical load centers (unit substations) and construction of a third new load center within the Morris Forman Water Quality Treatment Center, located at 4522 Algonquin Parkway, Louisville, KY 40211. This project also includes the construction of appurtenant equipment, conduit, cabling, equipment pads, trench drain,
- Status
- Under Construction
- Sector
- Telecommunications, Water Supply and Storage, Power Generation (CCGT), Road, Government, Commercial, Waste Processing and Treatment
- Location
- Louisville, Kentucky, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about MFWQTC Secondary Load Centers Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Description and location of Project: Project includes replacement of two existing electrical load centers (unit substations) and construction of a third new load center within the Morris Forman Water Quality Treatment Center, located at 4522 Algonquin Parkway, Louisville, KY 40211. This project also includes the construction of appurtenant equipment, conduit, cabling, equipment pads, trench drain, and containment sump. All work shall be done in accordance to MSD's Standard Specifications. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kentucky |
City | Louisville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Telecommunications, Water Supply and Storage, Power Generation (CCGT), Road, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Telecommunications projects in United States of America
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- INSTALL 1 FLAGPOLE,6 ANTENNAS,1 RADOME,3 POWER CABLES,3 HYBR D CABLES,JUMPERS FROM RRUS TO ANTENNAS,NEW 10'X10'LEASE..SEE
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- COLLOCATION OF (3)NEW ANTENNAS & ASSOCIATED CABLES & EQUIPMT PER ATTACHED SCOPE OF WORK. 6904 COMPLIANT AT&T (E)CELL SITE
