logo

Mhaiskar Infrastructure Private Limited

Sector: Road • Location: India

Source: World Bank Group

Project
Active

Maharashtra State Road Development Corporation (MSRDC) awarded a 15 year concession to Ideal Road Builders Private Limited (IRB) to operate, toll and maintain both the Mumbai-Pune Expressway (MPEW) and National Highway 4 (NH4).Ideal Road Builders Private Limited (IRB)created Mhaiskar Infrastructure Private Limited to implement the project.

MSRDC handed over both the roads to IRB in August 2004 fo

Status
Prospective
Sector
Road, Government, Manufacturing (Industrial), Commercial
Location
India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Mhaiskar Infrastructure Private Limited

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Mhaiskar Infrastructure Private Limited” is an infrastructure initiative in the Road sector, located in India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Maharashtra State Road Development Corporation (MSRDC) awarded a 15 year concession to Ideal Road Builders Private Limited (IRB) to operate, toll and maintain both the Mumbai-Pune Expressway (MPEW) and National Highway 4 (NH4).Ideal Road Builders Private Limited (IRB)created Mhaiskar Infrastructure Private Limited to implement the project. MSRDC handed over both the roads to IRB in August 2004 for an upfront fee of Rs. 918 crore (US$ 202.56 million). The contract involved: · Operation and maintenance of the 94 km MPEW and exclusive toll collection rights to IRB for 15 years. MPEW was a toll road when the contract was awarded. · Upgrade of the 111 km Mumbai-Pune stretch of NH-4 to a four lane highway in 24 months. · Operation and maintenance of NH-4 and exclusive toll collection rights to IRB. NH-4 was not a toll road when the contract was awarded. Toll collection was permissible only after the 4-lane upgrade of NH-4 was completed. MSRDC estimated an additional expenditure of Rs 1143.40 crore (US$ 252.29) for the upgrade and operation and maintenance. MSRDC included both roads connecting Mumbai to Pune in the contract to make the tender financially attractive to potential investors. IRB was the highest bidder at Rs. 918 crore (US$ 202.56 million). Other bidders included a joint venture between Gammon India and Ashok Buildcon, GMR infrastructure, Viva Highways and Viva Infrastructure Pvt. Ltd., and a joint venture between Shaktikumar Sancheti, Sangam India and Nidhi Mercantile.

Original sector

Transport

Procurement method

Budget

Location

Country

India

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Government, Manufacturing (Industrial), Commercial

Article published date

2024-09-30

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project