logo

MHOG Marion Transmission Main

Sector: Road • Location: Brighton, Michigan, United States of America

Source: Dodge USA

Project
Closed

Project location: Marion Township, Michigan; Livingston County, Michigan Project highlights: Water main construction via both open excavation and directional-drilling methods. Project description: Schedule A: Construction of approximately 8,144 lineal feet of 20-inch water main via open excavation as well as directional-drilling methods under wetlands, the Shiawassee River, and County Farm Road. S

Status
Closed
Sector
Road, Government, Commercial, Raw Materials, Waste Processing and Treatment, Water Supply and Storage
Location
Brighton, Michigan, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about MHOG Marion Transmission Main

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “MHOG Marion Transmission Main” is an infrastructure initiative in the Road sector, located in Brighton, Michigan, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Project location: Marion Township, Michigan; Livingston County, Michigan Project highlights: Water main construction via both open excavation and directional-drilling methods. Project description: Schedule A: Construction of approximately 8,144 lineal feet of 20-inch water main via open excavation as well as directional-drilling methods under wetlands, the Shiawassee River, and County Farm Road. Schedule B: Construction of approximately 10,000 lineal feet of water main via open excavation as ...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Michigan

City

Brighton

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Road, Government, Commercial, Raw Materials, Waste Processing and Treatment, Water Supply and Storage

Article published date

2024-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project