logo

Mhow-Khandwa Gauge Conversion Railway Project

Sector: Rail • Location: Indore, Madhya Pradesh, India

Source: ThePrint

Project
Under Construction

The Mhow-Khandwa gauge conversion project involves converting the historic narrow-gauge railway line into a broad-gauge line. The project includes laying a 156-km-long broad-gauge railway line, which will reduce the distance between Indore and Mumbai and strengthen connectivity between western Madhya Pradesh and south India. The project affects dense forests in Indore and Khargone districts, requi

Status
Under Construction
Sector
Rail, Mass Transit, Raw Materials, Government
Location
Indore, Madhya Pradesh, India
Updated
22 Jul 2026
Source
ThePrint

ConstructChat

Ask ConstructChat about Mhow-Khandwa Gauge Conversion Railway Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Mhow-Khandwa Gauge Conversion Railway Project” is an infrastructure initiative in the Rail sector, located in Indore, Madhya Pradesh, India. Taiyo aggregates data on it from ThePrint.

Participants

Sponsoring Agency

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Mhow-Khandwa gauge conversion project involves converting the historic narrow-gauge railway line into a broad-gauge line. The project includes laying a 156-km-long broad-gauge railway line, which will reduce the distance between Indore and Mumbai and strengthen connectivity between western Madhya Pradesh and south India. The project affects dense forests in Indore and Khargone districts, requiring the felling of approximately 1.24 lakh trees. A detailed mitigation plan has been prepared, including tree plantation in compensation areas.

Original sector

Transportation

Location

Country

India

State

Madhya Pradesh

City

Indore

Source

Source

ThePrint

URL

More Details

Record type

Project

Sector

Rail, Mass Transit, Raw Materials, Government

Article published date

2025-11-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project