logo

MIA Concourse F Refurbishment-F4 Holdroom Structural Repairs

One of 10,000+ projects Taiyo tracks in Florida.

Source: Dodge USA

Project
Closed

The overall project scope is divided into Gate F4, Gate F6 and Gate F8 and includes interior upgrades to the existing hold rooms and additional structural repairs at Gate F4. Gate F4: Demolition of the existing windows Demolition of the existing jetway access doorway, removal of the rubber mat and surrounding metal strip frame Removal of existing interior drywall back to existing studs. Demolition

Status
Closed
Sector
Metal, Airport, Government, Commercial, Manufacturing (Industrial)
Location
Miami, Florida, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about MIA Concourse F Refurbishment-F4 Holdroom Structural Repairs

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “MIA Concourse F Refurbishment-F4 Holdroom Structural Repairs” is an infrastructure initiative in the Metal sector, located in Miami, Florida, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The overall project scope is divided into Gate F4, Gate F6 and Gate F8 and includes interior upgrades to the existing hold rooms and additional structural repairs at Gate F4. Gate F4: Demolition of the existing windows Demolition of the existing jetway access doorway, removal of the rubber mat and surrounding metal strip frame Removal of existing interior drywall back to existing studs. Demolition of soffit and ceiling in exterior space below. Prepare and level existing surface for new floori...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Florida

City

Miami

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Metal, Airport, Government, Commercial, Manufacturing (Industrial)

Article published date

2024-04-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project