MIA Precast Panel Repair
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
MIA Precast Panel Repair at the Air Traffic Control Tower. Renovations are required for precast concrete, fireproofing, waterproofing, structural steel, metal finishing, HVAC filters, painting, smoke / fire detectors, soil stabilization, joint sealants and a final clean.
- Status
- Closed
- Sector
- Commercial, Manufacturing (Industrial), Metal, Cement, Steel
- Location
- Miami, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about MIA Precast Panel Repair
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | MIA Precast Panel Repair at the Air Traffic Control Tower. Renovations are required for precast concrete, fireproofing, waterproofing, structural steel, metal finishing, HVAC filters, painting, smoke / fire detectors, soil stabilization, joint sealants and a final clean. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Miami |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Manufacturing (Industrial), Metal, Cement, Steel |
Article published date | 2024-11-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
