MIA Vertically Integrated Cargo Community (VICC) PPP
Sector: Consumer Products • Location: Miami, Florida, United States of America
Source: Dodge USA
The proposed VICC facility will consist of a four-level structure with no less than 600,000 SF of cargo operations area that will include an automated and mechanized cargo handling system, up to 189 truck docks, dock operations, cargo acceptance, intermediate automated storage an retrieval systems, buildup/breakdown stations, administrative offices, training, and conference facilities, Department
- Status
- Prospective
- Sector
- Consumer Products, Residential, Warehouse, Rail, Commercial, Road, Raw Materials, Cement
- Location
- Miami, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about MIA Vertically Integrated Cargo Community (VICC) PPP
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed VICC facility will consist of a four-level structure with no less than 600,000 SF of cargo operations area that will include an automated and mechanized cargo handling system, up to 189 truck docks, dock operations, cargo acceptance, intermediate automated storage an retrieval systems, buildup/breakdown stations, administrative offices, training, and conference facilities, Department of Homeland Security services including federal inspection and screening facilities, and a robust... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Miami |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Residential, Warehouse, Rail, Commercial, Road, Raw Materials, Cement |
Article published date | 2024-07-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- WMATA Orange and Blue Line Rehabilitation
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
