Miami Foley Road Bridge Replacement Project
Sector: Road • Location: Oregon, United States
Source: Tillamook County Pioneer
The Miami Foley Road Bridge Replacement Project involves replacing the Crystal Creek temporary bridge and the Dry Creek culvert with two new permanent bridges. The project aims to minimize traffic disruptions by constructing each bridge one lane at a time, allowing for single-lane access during most of the construction period.
- Status
- Under Construction
- Sector
- Road, Bridge
- Location
- Oregon, United States of America
- Updated
- 22 Jul 2026
- Source
- Tillamook County Pioneer
ConstructChat
Ask ConstructChat about Miami Foley Road Bridge Replacement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Miami Foley Road Bridge Replacement Project involves replacing the Crystal Creek temporary bridge and the Dry Creek culvert with two new permanent bridges. The project aims to minimize traffic disruptions by constructing each bridge one lane at a time, allowing for single-lane access during most of the construction period. |
Location
Country | United States of America (USA) |
State | Oregon |
Source
Source | Tillamook County Pioneer |
URL |
More Details
Record type | Project |
Sector | Road, Bridge |
Article published date | 2025-05-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
