Michael Uren Biomedical Engineering Research Hub, London
One of 10,000+ projects Taiyo tracks in United Kingdom.
Source: Pharmaceutical Technology
The Michael Uren Biomedical Engineering Research Hub is a state-of-the-art laboratory and office facility being developed at the Imperial College London campus in White City, London. Biomedical research hub Imperial College campus, White City, London January 2017 £70m ($87.22m) 2019 Allies and Morrison Imperial College London ISG, Buro Happold Engineering, Jones Lang LaSalle, Curtins, Faithful+Gou
- Status
- Closed
- Sector
- Cement, Commercial, Education, Hospital, Manufacturing (Industrial), Power Generation (CCGT), Steel, Hotel, Residential, Solar, Government, Metal
- Location
- United Kingdom
- Updated
- 22 Jul 2026
- Source
- Pharmaceutical Technology
ConstructChat
Ask ConstructChat about Michael Uren Biomedical Engineering Research Hub, London
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Michael Uren Biomedical Engineering Research Hub is a state-of-the-art laboratory and office facility being developed at the Imperial College London campus in White City, London. Biomedical research hub Imperial College campus, White City, London January 2017 £70m ($87.22m) 2019 Allies and Morrison Imperial College London ISG, Buro Happold Engineering, Jones Lang LaSalle, Curtins, Faithful+Gould The Michael Uren Biomedical Engineering Research Hub is a state-of-the-art laboratory and office facility being developed at the Imperial College London campus in White City, London. Located next to the Hammersmith Hospital campus, the facility will accommodate more than 500 researchers, engineers, scientists and clinicians who will work together to address the most critical biomedical and healthcare problems. The planning application for the building was approved by Hammersmith and Fulham Council in July 2015. Construction began in January 2017 and is expected to be completed by 2019. The research hub will be a 14-storey arrow-shaped building with a total floor space of around 20,000m². It will be a hybrid concrete and steel frame structure shaped in the form of a triangle, which will house complex mechanical and electrical services infrastructure. The building will feature prefabricated and geometrically distinct vertical fins placed in front of glazed facades to give solar shading and privacy to the interiors. It will also feature flexible floorplates and energy-efficient servicing. The research facility will have space for translational research initiatives and will include research laboratories, an outpatient facility, a 150-seat auditorium, and public spaces. The building will also include a clinical facility next to the laboratories and office spaces. The laboratory and clinic spaces on each floor will be interconnected. The facility’s research scope will include new technologies for the early detection, monitoring and treatment of cancers. It will also develop simple invasive implants and regenerative medicine to aid in recovery from nervous system injuries. The facility will also drive the clinical translation of MedTech innovation using integrated clinical and imaging facilities at the Hammersmith Hospital. Allies and Morrison Architects designed the Michael Uren biomedical engineering research hub. ISG was appointed as the project’s construction contractor. Buro Happold Engineering was chosen as the mechanical and electrical engineer to provide building services, engineering, sustainability, facade engineering and fire engineering services. Jones Lang LaSalle was appointed for town planning, Curtins as structural engineer, and Faithful+Gould as cost consultant for the building. The research hub is designed to achieve the Building Research Establishment Environmental Assessment Method (BREEAM) ‘very good’ environmental performance rate. It will be equipped with a fume exhaust system that will dilute fumes exhausted through the ventilation system before releasing them into the atmosphere. The facility will also be installed with efficient mechanical, electrical and plumbing systems. The biomedical research hub is being built with a £70m ($87.22m) investment. Michael Uren and his foundation have donated £40m ($67.35m) to the project. The Higher Education Funding Council for England (HEFCE) has contributed £20m ($24.67m) for the project under the UK Research Partnership Investment Fund (UK RPIF). Get industry leading news, data and analysis delivered to your inbox Give your business an edge with our leading industry insights. |
Original sector | Health |
Budget |
Location
Country | United Kingdom (UK) |
Source
Source reliability | High |
Source | Pharmaceutical Technology |
URL |
More Details
Record type | Project |
Sector | Cement, Commercial, Education, Hospital, Manufacturing (Industrial), Power Generation (CCGT), Steel, Hotel, Residential, Solar, Government, Metal |
Article published date | 2023-08-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United Kingdom
- River Humber Gas Pipeline Replacement Project, North Lincolnshire
- A556 Knutsford-Bowdon Improvement Project
- Rose Whittle Delta Bloc Barrier System, United Kingdom
- Sealord Fish Processing, Caistor
- M80 Stepps to Haggs Upgrade Project
- M74 Motorway Completion
- A160/A180 Port of Immingham Improvement Project, North-East Lincolnshire, UK
- Medway-Canvey Island Thames Crossing
