logo
ProjectClosed

Michael Uren Biomedical Engineering Research Hub, London

One of 10,000+ projects Taiyo tracks in United Kingdom.

Source: Pharmaceutical Technology

The Michael Uren Biomedical Engineering Research Hub is a state-of-the-art laboratory and office facility being developed at the Imperial College London campus in White City, London. Biomedical research hub Imperial College campus, White City, London January 2017 £70m ($87.22m) 2019 Allies and Morrison Imperial College London ISG, Buro Happold Engineering, Jones Lang LaSalle, Curtins, Faithful+Gou

Status
Closed
Sector
Cement, Commercial, Education, Hospital, Manufacturing (Industrial), Power Generation (CCGT), Steel, Hotel, Residential, Solar, Government, Metal
Location
United Kingdom
Updated
22 Jul 2026
Source
Pharmaceutical Technology

ConstructChat

Ask ConstructChat about Michael Uren Biomedical Engineering Research Hub, London

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Michael Uren Biomedical Engineering Research Hub, London” is an infrastructure initiative in the Cement sector, located in United Kingdom. Taiyo aggregates data on it from Pharmaceutical Technology.

Participants

Sponsoring Agency

Company

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Michael Uren Biomedical Engineering Research Hub is a state-of-the-art laboratory and office facility being developed at the Imperial College London campus in White City, London. Biomedical research hub Imperial College campus, White City, London January 2017 £70m ($87.22m) 2019 Allies and Morrison Imperial College London ISG, Buro Happold Engineering, Jones Lang LaSalle, Curtins, Faithful+Gould The Michael Uren Biomedical Engineering Research Hub is a state-of-the-art laboratory and office facility being developed at the Imperial College London campus in White City, London. Located next to the Hammersmith Hospital campus, the facility will accommodate more than 500 researchers, engineers, scientists and clinicians who will work together to address the most critical biomedical and healthcare problems. The planning application for the building was approved by Hammersmith and Fulham Council in July 2015. Construction began in January 2017 and is expected to be completed by 2019. The research hub will be a 14-storey arrow-shaped building with a total floor space of around 20,000m². It will be a hybrid concrete and steel frame structure shaped in the form of a triangle, which will house complex mechanical and electrical services infrastructure. The building will feature prefabricated and geometrically distinct vertical fins placed in front of glazed facades to give solar shading and privacy to the interiors. It will also feature flexible floorplates and energy-efficient servicing. The research facility will have space for translational research initiatives and will include research laboratories, an outpatient facility, a 150-seat auditorium, and public spaces. The building will also include a clinical facility next to the laboratories and office spaces. The laboratory and clinic spaces on each floor will be interconnected. The facility’s research scope will include new technologies for the early detection, monitoring and treatment of cancers. It will also develop simple invasive implants and regenerative medicine to aid in recovery from nervous system injuries. The facility will also drive the clinical translation of MedTech innovation using integrated clinical and imaging facilities at the Hammersmith Hospital. Allies and Morrison Architects designed the Michael Uren biomedical engineering research hub. ISG was appointed as the project’s construction contractor. Buro Happold Engineering was chosen as the mechanical and electrical engineer to provide building services, engineering, sustainability, facade engineering and fire engineering services. Jones Lang LaSalle was appointed for town planning, Curtins as structural engineer, and Faithful+Gould as cost consultant for the building. The research hub is designed to achieve the Building Research Establishment Environmental Assessment Method (BREEAM) ‘very good’ environmental performance rate. It will be equipped with a fume exhaust system that will dilute fumes exhausted through the ventilation system before releasing them into the atmosphere. The facility will also be installed with efficient mechanical, electrical and plumbing systems. The biomedical research hub is being built with a £70m ($87.22m) investment. Michael Uren and his foundation have donated £40m ($67.35m) to the project. The Higher Education Funding Council for England (HEFCE) has contributed £20m ($24.67m) for the project under the UK Research Partnership Investment Fund (UK RPIF). Get industry leading news, data and analysis delivered to your inbox Give your business an edge with our leading industry insights.

Original sector

Health

Budget

Location

Country

United Kingdom (UK)

Source

Source reliability

High

Source

Pharmaceutical Technology

URL

More Details

Record type

Project

Sector

Cement, Commercial, Education, Hospital, Manufacturing (Industrial), Power Generation (CCGT), Steel, Hotel, Residential, Solar, Government, Metal

Article published date

2023-08-02

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project