logo

Michael Uren Biomedical Engineering Research Hub, London

Sector: Cement • Location: United Kingdom

Source: Pharmaceutical Technology

Project
Closed

The Michael Uren Biomedical Engineering Research Hub is a state-of-the-art laboratory and office facility being developed at the Imperial College London campus in White City, London. Biomedical research hub Imperial College campus, White City, London January 2017 £70m ($87.22m) 2019 Allies and Morrison Imperial College London ISG, Buro Happold Engineering, Jones Lang LaSalle, Curtins, Faithful+Gou

Project Information FAQ

Project Information

5 Q
The project “Michael Uren Biomedical Engineering Research Hub, London” is an infrastructure initiative in the Cement sector, located in United Kingdom. Taiyo aggregates data on it from Pharmaceutical Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Michael Uren Biomedical Engineering Research Hub is a state-of-the-art laboratory and office facility being developed at the Imperial College London campus in White City, London. Biomedical research hub Imperial College campus, White City, London January 2017 £70m ($87.22m) 2019 Allies and Morrison Imperial College London ISG, Buro Happold Engineering, Jones Lang LaSalle, Curtins, Faithful+Gould The Michael Uren Biomedical Engineering Research Hub is a state-of-the-art laboratory and office facility being developed at the Imperial College London campus in White City, London. Located next to the Hammersmith Hospital campus, the facility will accommodate more than 500 researchers, engineers, scientists and clinicians who will work together to address the most critical biomedical and healthcare problems. The planning application for the building was approved by Hammersmith and Fulham Council in July 2015. Construction began in January 2017 and is expected to be completed by 2019. The research hub will be a 14-storey arrow-shaped building with a total floor space of around 20,000m². It will be a hybrid concrete and steel frame structure shaped in the form of a triangle, which will house complex mechanical and electrical services infrastructure. The building will feature prefabricated and geometrically distinct vertical fins placed in front of glazed facades to give solar shading and privacy to the interiors. It will also feature flexible floorplates and energy-efficient servicing. The research facility will have space for translational research initiatives and will include research laboratories, an outpatient facility, a 150-seat auditorium, and public spaces. The building will also include a clinical facility next to the laboratories and office spaces. The laboratory and clinic spaces on each floor will be interconnected. The facility’s research scope will include new technologies for the early detection, monitoring and treatment of cancers. It will also develop simple invasive implants and regenerative medicine to aid in recovery from nervous system injuries. The facility will also drive the clinical translation of MedTech innovation using integrated clinical and imaging facilities at the Hammersmith Hospital. Allies and Morrison Architects designed the Michael Uren biomedical engineering research hub. ISG was appointed as the project’s construction contractor. Buro Happold Engineering was chosen as the mechanical and electrical engineer to provide building services, engineering, sustainability, facade engineering and fire engineering services. Jones Lang LaSalle was appointed for town planning, Curtins as structural engineer, and Faithful+Gould as cost consultant for the building. The research hub is designed to achieve the Building Research Establishment Environmental Assessment Method (BREEAM) ‘very good’ environmental performance rate. It will be equipped with a fume exhaust system that will dilute fumes exhausted through the ventilation system before releasing them into the atmosphere. The facility will also be installed with efficient mechanical, electrical and plumbing systems. The biomedical research hub is being built with a £70m ($87.22m) investment. Michael Uren and his foundation have donated £40m ($67.35m) to the project. The Higher Education Funding Council for England (HEFCE) has contributed £20m ($24.67m) for the project under the UK Research Partnership Investment Fund (UK RPIF). Get industry leading news, data and analysis delivered to your inbox Give your business an edge with our leading industry insights.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data