Micro Hydro Project
Sector: Water Supply and Storage • Location: Fort St. John, British Columbia, Canada
Source: City of Fort St. John
The Micro Hydro project, built in 2016, utilizes a generator on the gravity-fed discharge pipe from the City’s wastewater treatment facility to produce 780 MWh of energy annually, sufficient to power 70 homes. The project generates approximately $75,000 in revenue from BC Hydro and has received awards for engineering excellence.
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Hydro, Government
- Location
- Fort St. John, British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- City of Fort St. John
ConstructChat
Ask ConstructChat about Micro Hydro Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Micro Hydro project, built in 2016, utilizes a generator on the gravity-fed discharge pipe from the City’s wastewater treatment facility to produce 780 MWh of energy annually, sufficient to power 70 homes. The project generates approximately $75,000 in revenue from BC Hydro and has received awards for engineering excellence. |
Original sector | Energy |
Location
Country | Canada |
State | British Columbia |
City | Fort St. John |
Source
Source | City of Fort St. John |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Hydro, Government |
Article published date | 2025-04-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
