logo

MICRO-MECHANICAL PUMP FOR NEXT GENERATION INSULIN DELIVERY SYSTEMS

Sector: Hospital • Location: Denmark, Israel, Spain, Italy

Source: EU Funding & Tenders Portal

Project
Ended

PRISMA is a revolutionary thin-film micropump realized with novel ceria-based oxides actuating materials in the frame of the FET-OPEN BioWings project, which can be used as an innovative pumping system in wearable insulin delivery devices for the treatment of diabetes. The integration of the PRISMA micropump in insulin patch pumps addresses the 3 most important pain points that still keep the vast

Project Information FAQ

Project Information

4 Q
The project “MICRO-MECHANICAL PUMP FOR NEXT GENERATION INSULIN DELIVERY SYSTEMS” is an infrastructure initiative in the Hospital sector, located in Denmark, Israel, Spain, Italy. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ended

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

PRISMA is a revolutionary thin-film micropump realized with novel ceria-based oxides actuating materials in the frame of the FET-OPEN BioWings project, which can be used as an innovative pumping system in wearable insulin delivery devices for the treatment of diabetes. The integration of the PRISMA micropump in insulin patch pumps addresses the 3 most important pain points that still keep the vast majority of diabetic patients away from this life-saving treatment: 1) Size, which is more than two orders of magnitude smaller than state of the art. 2) Higher drug delivery accuracy within the ?5% range ensures the highest therapeutic efficacy. 3) drastic reduction in energy consumption. Besides the short-term vision to realise extremely compact and accurate patch pumps, the long term goal is to allow the realisation of multi-drug delivery systems, making real the much-lauded multi-hormone treatment. The main objective of this project is to validate the pump and its manufacturing process in a real operating environment, proving to system integrators that all specifications are consistently met to pave the way for the post-project system integration and clinical validation. This will pave the way to the launch of a startup company that will take care of the final steps of the development roadmap and will establish long-term cooperation agreements with prominent medical device manufacturers for the integration of PRISMA in next-generation single and multi-hormone smart patches.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data