logo
ProjectClosed

Micro Surfacing

One of 10,000+ projects Taiyo tracks in Wisconsin.

Source: Dodge USA

micro surfacing to be applied to four separate roads totaling approximately 1.6 miles. 6 3/16 Ave at 26 '/-27th Street to town line, 25 1/16th Street at 8 7/8 Ave to end of road, 26 '/ Street at 8 '/ Ave to end of road, and 8 3 / 4 Ave at 26 '/ Street to end of road.

Status
Closed
Sector
Road, Government, Commercial, Manufacturing (Industrial)
Location
Chetek, Wisconsin, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Micro Surfacing

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Micro Surfacing” is an infrastructure initiative in the Road sector, located in Chetek, Wisconsin, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

micro surfacing to be applied to four separate roads totaling approximately 1.6 miles. 6 3/16 Ave at 26 '/-27th Street to town line, 25 1/16th Street at 8 7/8 Ave to end of road, 26 '/ Street at 8 '/ Ave to end of road, and 8 3 / 4 Ave at 26 '/ Street to end of road.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Wisconsin

City

Chetek

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Road, Government, Commercial, Manufacturing (Industrial)

Article published date

2024-07-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project