Microscreen Relocation (ROBER 162649)
Sector: Water Supply and Storage • Location: Roberts, Wisconsin, United States of America
Source: Dodge
Major components of the Work include: 1. Relocation of existing belt thickener equipment. 2. Process piping, valves, and equipment installation and modifications. 3. Construct steel platform for belt thickener relocation. 4. Electrical power and SCADA controls modifications.
- Status
- Closed
- Sector
- Water Supply and Storage, Steel, Government, Waste Processing and Treatment, Commercial, Power Generation (CCGT), Metal
- Location
- Roberts, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Microscreen Relocation (ROBER 162649)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Major components of the Work include: 1. Relocation of existing belt thickener equipment. 2. Process piping, valves, and equipment installation and modifications. 3. Construct steel platform for belt thickener relocation. 4. Electrical power and SCADA controls modifications. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Roberts |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Steel, Government, Waste Processing and Treatment, Commercial, Power Generation (CCGT), Metal |
Article published date | 2025-01-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
