Microsoft African Data Centre Project
The owner, status and timeline of this project. A free account opens every field.
Source: News24
A major Microsoft data centre site in East Africa, envisioned as a $1 billion geothermal-powered project to increase cloud computing capacity in the region. The project includes an initial phase with about 100 megawatts capacity, aiming to build up to 1 gigawatt. The project is a joint venture between Microsoft and Abu Dhabi-based tech conglomerate G42, intended to support AI development and cloud
- Status
- Failure
- Sector
- Geothermal, Data Center
- Location
- Nairobi, Kenya
- Updated
- 22 Jul 2026
- Source
- News24
ConstructChat
Ask ConstructChat about Microsoft African Data Centre Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | delayed |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A major Microsoft data centre site in East Africa, envisioned as a $1 billion geothermal-powered project to increase cloud computing capacity in the region. The project includes an initial phase with about 100 megawatts capacity, aiming to build up to 1 gigawatt. The project is a joint venture between Microsoft and Abu Dhabi-based tech conglomerate G42, intended to support AI development and cloud computing in Kenya. |
Original sector | Technology |
Budget |
Location
Country | Kenya |
City | Nairobi |
Source
Source | News24 |
URL |
More Details
Record type | Project |
Sector | Geothermal, Data Center |
Article published date | 2026-05-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
