logo
ProjectUnder Construction

Microsoft AI Data Center Expansion in Abilene, Texas

Under construction · Texas · Last reported Mar 2026

Source: FOX4KC

Microsoft is taking over a data center construction project in Abilene, Texas, building two new AI factory buildings and an on-site power plant next to the existing OpenAI and Oracle computing campus. The expansion will bring the total number of data center buildings in the complex to 10, with a total computing capacity of 2.1 gigawatts. The new power plant will generate 900 megawatts, larger than

Status
Under Construction
Sector
Data Center, Power Generation (CCGT), Manufacturing (Industrial), Commercial
Location
Abilene, Texas, United States of America
Updated
22 Jul 2026
Source
FOX4KC

ConstructChat

Ask ConstructChat about Microsoft AI Data Center Expansion in Abilene, Texas

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Microsoft AI Data Center Expansion in Abilene, Texas” is an infrastructure initiative in the Data Center sector, located in Abilene, Texas, United States. Taiyo aggregates data on it from FOX4KC.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Microsoft is taking over a data center construction project in Abilene, Texas, building two new AI factory buildings and an on-site power plant next to the existing OpenAI and Oracle computing campus. The expansion will bring the total number of data center buildings in the complex to 10, with a total computing capacity of 2.1 gigawatts. The new power plant will generate 900 megawatts, larger than the existing 350-megawatt plant serving OpenAI and Oracle.

Original sector

Technology

Location

Country

United States of America (USA)

State

Texas

City

Abilene

Source

Source

FOX4KC

URL

More Details

Record type

Project

Sector

Data Center, Power Generation (CCGT), Manufacturing (Industrial), Commercial

Article published date

2026-03-30

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project