logo
ProjectHalted

Microsoft AI Data Centre in Kenya

The owner, status and timeline of this project. A free account opens every field.

Source: Channel News

Microsoft, alongside UAE-based tech firm G42, planned a $1 billion geothermal-powered AI data centre in Kenya's Rift Valley with an initial 100 MW capacity and ambitions to scale up to 1 GW. The project was halted due to concerns over its massive energy demands potentially requiring switching off half the country.

Status
Failure
Sector
Geothermal, Data Center
Location
Kenya
Updated
22 Jul 2026
Source
Channel News

ConstructChat

Ask ConstructChat about Microsoft AI Data Centre in Kenya

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Microsoft AI Data Centre in Kenya” is an infrastructure initiative in the Geothermal sector, located in Kenya. Taiyo aggregates data on it from Channel News.

Participants

Not available for this record.

Status

Original status

halted

Taiyo status

Failure

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Microsoft, alongside UAE-based tech firm G42, planned a $1 billion geothermal-powered AI data centre in Kenya's Rift Valley with an initial 100 MW capacity and ambitions to scale up to 1 GW. The project was halted due to concerns over its massive energy demands potentially requiring switching off half the country.

Original sector

Energy

Budget

Location

Country

Kenya

Source

Source

Channel News

URL

More Details

Record type

Project

Sector

Geothermal, Data Center

Article published date

2026-05-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project